Tear-off and reroof quantities from the roof plan and details.
New installations
Steep-slope and low-slope roofs on residential and commercial work.
Commercial roofing
Tile, slate, metal, and membrane systems priced for the project location.
Also priced with the MEP set
Roof covering
Shingles, tile, metal, or membrane, measured from the roof plans.
Underlayment
Underlayment and ice barrier where the details call for them.
Flashing and metal
Edge metal, valleys, wall flashing, and drip edge as their own lines.
Accessories
Vents, penetrations, and other roof accessories counted off the drawings.
Â
How the number is built
Quantities from the drawings, prices from the zip code
PlanSwift is used for the on-screen takeoff. Material and labor are lined out by CSI division, then priced with zip-code data so the bid reflects the project location, not a national average. Estimates follow AACE and AIQS standards.
For roofing contractors, general contractors, home builders, and developers.
Delivery time depends on the size of the set. After the plans are in, you get a quote with the turnaround before any work starts.
How It Works
01
Send the plans
Share drawings by Google Drive, OneDrive, email, or a file link. Bid sets, schematic, design development, and construction documents are all fine.
02
Receive your quote
The plans are reviewed and you get a price, a turnaround, and a delivery date.
03
Takeoff and pricing
Digital quantities are organized by CSI division, with material and labor broken out.
04
Excel and markups
You receive the estimate in Excel, in CSI MasterFormat, with color-coded PlanSwift markups.
Â
What you get back
A roofing estimate you can bid
The file is organized so a roofing contractor or a general contractor can drop it into a bid. Use our template, or send yours and the takeoff is built in that sheet.
Start a bid
Feel Free to Contact & Hire Us
To begin, please send us the plans and project details & specifications. Once received, our estimators will review the information and promptly provide you with a quote and proposed turnaround time.